Crawley MRF / WTS Fire Repairs and Refurbishment

Structural Refurbishment of an operational waste facility following a fire.

Client
Biffa
SECTOR
Value
£1 million
Duration
12 weeks

The project included the replacement of structural steel frame components and cladding, mechanical and electrical systems, HVAC systems, concrete slab hydrodemolition and replacement. We also devised, designed and installed push wall protection plates to increase the longevity of the concrete push walls. This system has since been installed at a number of waste plants offering significant maintenance cost savings.